Risk
Assessment - Installation Testing Commissioning Of Sprinkler System
|
|
|
|
|
|
Serial
|
Sub-Activities
|
Hazards Identified
|
Risks
Involved
|
Risk
Rating
|
Control
Measures
|
Residual
Risk
|
|
|
|
|
|
No.
|
(Generic & Task)
|
(People
& Property)
|
Severity
|
Probability
|
Initial
Risk
|
|
|
|
|
|
1
|
Prepare work area
|
· Unauthorized, untrained
workers
|
|
2
|
A
|
L
|
· TBT/DSTI to be conducted by the foreman/ safety officer prior to work commencement
|
Low (ALARP)
|
|
|
|
|
|
· Cuts
|
· Task specific safety training to be provided
|
|
|
|
|
|
· Abrasions
|
· Authorized personnel to undertake the job
|
|
|
|
|
|
|
· Daily safety
inspection should be carried and eliminate the hazard.
|
|
|
|
|
|
2
|
Manual Handling
|
· Incorrect lifting of loads
· Sharp edges.
· Placing the object while fingers underneath.
• Slip/trip/fall ( same level )
• Unsafe posture
|
· Back Injuries
· Cut to finger
· Strain
• Musculoskeletal
Injuries
|
3
|
C
|
M
|
· Any lifting tasks
shall be carried out by persons physically capable to do so
|
Low (ALARP)
|
|
|
|
|
|
• No employee should
be asked to carry loads
|
|
|
|
|
|
above his capacity and in any case no load
shall exceed 30kg per man.
|
|
|
|
|
|
• Mass of the load
is more then to be equally shared
|
|
|
|
|
|
· Deploy enough number
of personnel for lifting shall be appointed to the task depending upon the type of load to be lifted.
|
|
|
|
|
|
·Use easy mode of transport like trolley etc.
|
|
|
|
|
|
• Load not to be
lifted above your shoulder height
|
|
|
|
|
|
• Keep your fingers
away from pinch point While placing
the load
|
|
|
|
|
|
• Area to be
illuminated with adequate lighting.
|
|
|
|
|
|
• PPE to be worn at
all times. (helmet, shoe, overall, vest, gloves, goggles, mask)
|
|
|
|
|
|
3
|
Transportation of
materials to site using with trailer, pickup, fork lift and crane
|
• Unauthorized, Untrained Workers
• Failure of lifting equipment
• Failure of lifting tools & tackles
• Unsafe lifting.
• Swinging of material
• Damaged sling/wire rope or a chain
• Poor maintenance of vehicle
• Speedy operation
• Over turn
• Over load
|
• Fatality
• Fractures
• Property damage
• Injury to personal
• Sprain and strain
|
4
|
C
|
H
|
• Ensure the crane and forklift engaged is tested and having valid
license and the operator has valid license and approved 3rd party
certificate.
|
M
|
|
|
|
|
|
• Engage trained and
certified banks man.
|
|
|
|
|
|
• Barrication and
warning signs in to the area where lifting operation is carried out and
restrict the entry.
|
|
|
|
|
|
• Check list should
be carried out to their vehicles by
the operator prior to start any work
|
|
|
|
|
|
• Use tagline for control of swing and alignment.
|
|
|
|
|
|
• The crane must be stopped when the wind
speed exceeds 38km/hr.
|
|
|
|
|
|
• SWL should be clearly marked on the crane and
should be check that is functioning.
|
|
|
|
|
|
• The crane and trucks shall be periodically maintained and a
periodical check has been done by the maintenance team.
|
|
|
|
|
|
·Vehicle
not to be left unattended at site (ie,to be switch off mode if required and
keys removed)
|
|
|
|
|
|
• SWL shall not be exceeded.
|
|
|
|
|
|
• Load should be secured properly with the equipment.
|
|
|
|
|
|
• Operators and rigger must wear high level of reflecting vest and
adequate PPE ( Shoe, helmet, leather gloves, goggles, over all )
|
|
|
|
|
|
·Vehicle
routes to be kept free of obstructions (with spillages being cleaned up
promptly)
|
|
|
|
|
|
·Any
reversing that is necessary should be overseen by a trained flagman / Banks
man.
|
|
|
|
|
|
·
Operator should follow the site speed limit and obey the traffic
rules.
|
|
|
|
|
|
• Colour coded system to be implemented to all lifting equipments as
per the month.
|
|
|
|
|
|
• Colour coded system to be implemented to all lifting equipments as
per the month.
|
|
|
|
|
|
4
|
Stacking and Storing
|
∙ Unauthorized,
untrained workers
· Material fall from height
• Improper stacking
• Collapse of materials
|
• Crush
· Cut and abrasion
· Damage to
property
|
3
|
B
|
M
|
· All materials shall
be stored below 2 meter height.
|
Low (ALARP)
|
|
|
|
|
|
· If the material is too heavy, use hydraulic trolley to shift the material.
|
|
|
|
|
|
• No storage of
materials to be done in the work place, only required quantity to be taken
for the job.
|
|
|
|
|
|
• Personnel
protective equipment must wear at all time during the activity. (Helmet,
shoe, vest, overall, gloves, goggles, mask.)
|
|
|
|
|
|
5
|
Installation of
sprinkler system and accessories
|
• Untrained, unauthorized
Workers
• Material Fall
• Sharp edges
• Unsafe posture
• Slip, trip and fall
|
• Cut and abrasion
• Back Injuries
• Fatigue
• Musculoskeletal
Injuries
|
3
|
C
|
M
|
· Authorized
personnel to undertake the job
|
Low (ALARP)
|
|
|
|
|
|
∙Work
location shall be inspected by concerned supervisor /
foreman.
|
|
|
|
|
|
• PPE to be worn at
all times( Gloves, goggles, mask, helmet, shoe, vest, overall)
|
|
|
|
|
|
· Deploy enough number
of personnel for material lifting shall be appointed to the
task depending upon the distance
|
|
|
|
|
|
• Materials should
not kept in walkways, edge of the
opening.
|
|
|
|
|
|
• Close supervision
to be done at all times
|
|
|
|
|
|
• Proper
communication to be maintained between
the workers while doing the installation
|
|
|
|
|
|
• Maintain a good
housekeeping policy to prevent from
slip, trip, and fall hazards.
|
|
|
|
|
|
6
|
Working in near
floor openings
|
· Material/equipment fall from height
· Slip/trip/fall
|
·Fatality
·Property Damage
• Fracture
|
4
|
B
|
M
|
• PTW to be applied
and obtained prior to start work
|
Low (ALARP)
|
|
|
|
|
|
∙ Rigid barrication and toe
board to be provided to all external edges and where a fall can occur.
|
|
|
|
|
|
• Authorized person
to do the job.
|
|
|
|
|
|
•Warning signboards
to be provided in those areas.
|
|
|
|
|
|
· PPE to be used at all times ( Helmet,
Shoes, Vest, Overall, Harness )
|
|
|
|
|
|
7
|
Working with Hand
tools ( Hack saw, torch wrench, hammer )
|
• Slip, trip and fall
• Damaged warn out hand tools
• Flying objects
∙ Mushroom Heads
• Using incorrect type
|
• Fatigue
• Trigger finger
• Cuts and abrasions
|
3
|
C
|
M
|
• Defective tools
should not be issued or used to perform the task, to be checked by store
keeper
|
Low (ALARP)
|
|
|
|
|
|
• Don’t extend the
spanner by using a pipe as an extension bar
|
|
|
|
|
|
• Never use a screw
driver as a chisel
|
|
|
|
|
|
•Hand tools shall be
free from oil, grease & etc.
|
|
|
|
|
|
• Chisel’s head
shall have safety cap to avoid finger
injury.
|
|
|
|
|
|
• Use eye/ face
protection when there is flying materials hazard, wear gloves while required
to protect the hands
|
|
|
|
|
|
• Never use a file
as a lever
|
|
|
|
|
|
• Use right tools
for the job
|
|
|
|
|
|
8
|
Working with power
tools ( Drill, grinding, pipe cutting machine )
|
• Defective equipment
• Electricity
• Improper use of equipment
• Poor maintenance
• Untrained workers
• Flying object
• Noise and vibration
• Fire
• Dust
|
• Hearing losses
• Eye injury
• Crushing
• Back injury
• Burns • Electrocution
• Ringing in the ear / Deafness
|
3
|
C
|
M
|
• PTW to be applied
and obtained prior to start, If spark producing activity is performed
|
M (ALARP)
|
|
|
|
|
|
· All portable power
tools should be fitted with adequate fuse protection either in the tool body
or in its electrical plug.
|
|
|
|
|
|
· Defective tools
should not be issued or used to perform a task.
|
|
|
|
|
|
· All portable power tools should be fitted with adequate fuse
protection either in the tool body or in its electrical plug.
|
|
|
|
|
|
• Monthly inspection
should be carried out by the electrician and record to be kept at the store
|
|
|
|
|
|
· The weight, size and type of tool should be selected to suit the job
being carried out.
|
|
|
|
|
|
• Don’t lay the
cables around the access way, it should be proper routing
|
|
|
|
|
|
• Industrial
distribution board and socket only to be used at site
|
|
|
|
|
|
• No joints shall be
made in electrical cable.
|
|
|
|
|
|
• Cable hangers
shall be used to avoid the direct
contact of power tools cable with the scaffolding members.
|
|
|
|
|
|
• Electrical
connection shall be routed through
ELCB only.
|
|
|
|
|
|
• Correct rate of
ELCB should be used ( Ex:-30ma only acceptable)
|
|
|
|
|
|
· Only those persons who have been adequately trained and experienced
in the use of the tool should be allowed to use the same. Power tools shall have inspection sticker.
|
|
|
|
|
|
· Tools should be stored and maintained in good working condition.
|
|
|
|
|
|
· Appropriate PPE
Should use ( Goggles, Mask, Ear plug, Gloves, Shoe, Helmet, Overall, Vest )
|
|
|
|
|
|
9
|
Working with ladder
|
• Person/ material falling from height
• Over reaching
• Over loading
• Obstructing the access way
• Slippery or uneven surface
|
• Sprain and strain
• Fracture
• Injury to the
person
|
3
|
C
|
M
|
• The ladder should
extend minimum one meter from the top
for safe movement
|
Low (ALARP)
|
|
|
|
|
|
• Heavy materials
should not be carried
|
|
|
|
|
|
• Do not erect in
slippery, uneven surface
|
|
|
|
|
|
• Should be set up
with a 4 vertical to 1 horizontal
slope ( 4:1 )
|
|
|
|
|
|
• Inspection and
maintenance to be registered and
recorded by the store keeper
|
|
|
|
|
|
• Remember the 3
point contact.
|
|
|
|
|
|
• Step ladder must
fully open and lock and the devices to be as per manufacturer
|
|
|
|
|
|
• Ladder to be used
for short duration works only limited
to 15 min.
|
|
|
|
|
|
• Defective ladder
should not be used and report it
immediately
|
|
|
|
|
|
• Do not work from
the top of two rungs
|
|
|
|
|
|
• Do not work in
front of the door. If work is carried then locked the door or blocked off
|
|
|
|
|
|
• Colour coded
system to be implemented
|
|
|
|
|
|
10
|
Working on mobile
scaffold
|
• Uneven surface
• Overhead structure and cable
• Materials and worker fall from height
• Untrained, unauthorized Workers
• Collapse of scaffold
|
• Sprain and strain
• Fracture
• Spinal cord damage
• Musculoskeletal
Injury
• Fatality
|
3
|
C
|
M
|
• Do not stack
materials on to the scaffold
|
Low (ALARP)
|
|
|
|
|
|
• Visual inspection
should carry before use
|
|
|
|
|
|
• Out rigger fitted
and breaks are locked on
|
|
|
|
|
|
• Only trained
scaffolders shall be involved in erection & dismantling activities.
|
|
|
|
|
|
• Keep walkways free
of obstacles, tools and equipment
|
|
|
|
|
|
• No person to be on
the scaffold while it is being moved
|
|
|
|
|
|
• Mobile scaffold
height should be restricted to 3.5 to
4 times the shortest base width, If height of scaffold exceeds raker support
or it should be tied to the structure
properly.
|
|
|
|
|
|
• Safety harness to
be used above 2mtr height and anchored in above shoulder height at all time
|
|
|
|
|
|
• Scaffold only use
in on level and surface area
|
|
|
|
|
|
• Tagging system to
be implemented ( i.e., all safe scaffolds shall be provided with green tags
and unsafe scaffolds with red tag )
|
|
|
|
|
|
• Never stand and
sit on the hand rails
|
|
|
|
|
|
11
|
Handling chemicals
(Solvent cement)
|
• Unauthorized, untrained workers
• Spillage
• Poor ventilation
• Fire
• Health hazards ( External / Internal )
|
· Skin injury
· Ingestion
• Eye injury
• Environment affect
• Property damage
• Occupational health
|
3
|
C
|
M
|
· Ensure the chemicals are stored as per the manufacturer recommendation and identification.
|
Low (ALARP)
|
|
|
|
|
|
•Adequate lighting
and ventilation to be provided
|
|
|
|
|
|
• MSDS to be
referred prior and to follow the
manufacturer instruction
|
|
|
|
|
|
• Trained and
authorized person to do the job
|
|
|
|
|
|
• Only required
quantity to take for the work
|
|
|
|
|
|
• Do not store
chemicals at non designated areas.
|
|
|
|
|
|
• Old/ empty
container return to store for proper
Dispose
|
|
|
|
|
|
• Container should
check for leakage before Handling
|
|
|
|
|
|
•
Personnel hygiene to be maintained while after use of chemicals
|
|
|
|
|
|
• All spillage shall
be clean by sand or other absorbent
materials
|
|
|
|
|
|
• Rubber gloves,
overall, helmet, vest, shoe, Goggles, mask to be worn while during the
activity
|
|
|
|
|
|
12
|
Welding work (arc)
|
• Fire
• Untrained, Unauthorized Worker
• Poor signage and barricade
• Lighting and ventilation
|
•Electric Shock
•Burns
•Skin Effect
•Eye Injury
•Property damage
|
4
|
C
|
H
|
• PTW to be applied
and obtained prior to start, If spark
producing activity is performed
|
Low (ALARP)
|
|
|
|
|
|
• Certified person
only undertake the welding job
|
|
|
|
|
|
• All Flammable
/combustible materials should be removed from the area where welding &
gas cutting operations are carried out.
|
|
|
|
|
|
• Fire blankets
should be used to contain sparks and molten metal’s within the floor and
should not be allowed to fall from height.
|
|
|
|
|
|
• Warning signs and
boards should be provided And area to be well barricaded
|
|
|
|
|
|
• Appropriate fire
extinguisher should be placed in to
the work area ( Dry powder, CO2, Fire blanket )
|
|
|
|
|
|
• Adequate lighting
and ventilation to be Provided.
|
|
|
|
|
|
• Close supervision
to be done at all times.
|
|
|
|
|
|
• Hoses should be of
approved type and should be free.
|
|
|
|
|
|
·Appropriate PPE
Should use ( Welding helmet, Dust mask, Goggles, Gloves, Shoe, Helmet,
Overall, Vest )
|
|
|
|
|
|
13
|
Operating
with Thread Machine
|
·Defective Machine
·Improper use of Machine
·Poor maintenance
·Untrained, Unauthorized Workers
• Slip, trip and fall
• Spillage
|
• Cuts
• Crush
• Skin Effect
• Entanglement
• Eye, finger injury
• Fracture
|
3
|
C
|
M
|
• Polythene sheets
to be laid and drip trays to be placed below the machine to prevent
spillages.
|
M (ALARP)
|
|
|
|
|
|
• Defective machine
should not be used to perform a task.
|
|
|
|
|
|
• Only those persons
who have been adequately trained and experienced
in the use of the machine should be allowed to use the same.
|
|
|
|
|
|
• Machine should be
maintained in good working Condition.
|
|
|
|
|
|
• All spillages must
be clean immediately
|
|
|
|
|
|
• Waste oil should
be disposed in an approved
|
|
|
|
|
|
Manner.
|
|
|
|
|
|
• Operator should
check the machine condition prior to start the work.
|
|
|
|
|
|
• Adequate lighting
and ventilation to be Provided.
|
|
|
|
|
|
• Don’t lay the
cables around the access way, it should be proper routing
|
|
|
|
|
|
• Industrial
distribution board and socket only to be used at site
|
|
|
|
|
|
• No joints shall be
made in electrical cable.
|
|
|
|
|
|
• Electrical
connection shall be routed through
ELCB only and should be used ( Ex:-30ma only acceptable)
|
|
|
|
|
|
• Fire extinguisher
to be provided
|
|
|
|
|
|
• Area to be
barricade and provide signage.
|
|
|
|
|
|
14
|
Working with electricity
|
• Electricity
• Conductors ( water, metal, concrete )
• Broken wires
• Improper plug, case
• Overloading
|
• Electrocution or
death
• Burns and shocks
• Muscle contraction
• Heart, lung
Paralysis
• Fire
|
4
|
B
|
M
|
• Only those persons who have been
adequately trained and certified in the work of electricity to allow for the
same.
|
Low (ALARP)
|
|
|
|
|
|
• Temporary live
cable management plan shall develop and implement during the activity.
|
|
|
|
|
|
• Defective tools and equipment should not be used, report it and
replaced it immediately.
|
|
|
|
|
|
• Electrical work
shall not carry out in wet Conditions.
|
|
|
|
|
|
• Barricade the location and signage to be placed where circuits and
equipments are energized.
|
|
|
|
|
|
• Lock out tag out (
LOTO) procedure to be followed during
testing & commissioning.
|
|
|
|
|
|
• Do not overload to
the circuits.
|
|
|
|
|
|
• Communicate to all
personnel about testing &
commissioning.
|
|
|
|
|
|
• Don’t use homemade electrical accessories and use industrial type
only.
|
|
|
|
|
|
• Disconnect main supply before
commencing of work.
|
|
|
|
|
|
• PPE should worn at all time
where working in energized circuits. ( Insulated gloves, Electric resistivity
shoe )
|
|
|
|
|
|
15
|
Flushing, pressure and leakage testing
|
• Untrained, unauthorized Workers
• Faulty pressure gauge
• Poor lighting
• Improper identification
• Bursting of pipes
|
• Fatality
• Property damage
• Fractures
• Full body injury
|
4
|
B
|
M
|
• PTW to be applied and obtained prior to start work
|
Low (ALARP)
|
|
|
|
|
|
• Calibrated pressure gauge only to be used for pressure testing
|
|
|
|
|
|
• Never pressure test the system/ pipe above its designed pressure.
|
|
|
|
|
|
• Proper lighting to be provided in around the working area.
|
|
|
|
|
|
• Never do hot work on a pressurized system ( always de-pressurize )
|
|
|
|
|
|
•
Calibrated instrument only to be used.
|
|
|
|
|
|
• Close supervision to be done at all times
|
|
|
|
|
|
• Use always regulators and never pressurize the system directly
without regulator.
|
|
|
|
|
|
• Warning signs and boards should be provided And area to be well barricaded
|
|
|
|
|
|
∙Only
qualified and trained person to do the job.
|
|
|
|
|
|
• Emergency
procedure to be briefed to all personnel prior to start the activity.
|
|
|
|
|
|
• Emergency
evacuation plan shall be readily available according to site condition and
briefed to the workforce prior to start.
|
|
|
|
|
|
•
Trained first aider, fire warden and emergency vehicle to be available at the
site during the activity.
|
|
|
|
|
|
• All personnel’s
involved shall be made aware of first aid treatment related to electric
injuries.
|
|
|
|
|
|
16
|
Working in hot
weather
|
∙ Heat Stress
|
|
2
|
B
|
M
|
· Drink plenty of water
|
Low (ALARP)
|
|
|
|
|
|
∙ Dehydration
|
∙ Employees shall be trained about heat
stress symptoms & first aid measures.
|
|
|
|
|
|
· Sunburn
|
· Avoid highly physical tasks during the hottest part of the day
|
|
|
|
|
|
· Skin Cancer
|
· Isotonic drinks to be provided
|
|
|
|
|
|
|
• Provide sufficient
rest breaks based on the humidity
& temperature conditions
|
|
|
|
|
|
17
|
While working at
night shift
|
|
|
3
|
B
|
M
|
· Proper illumination
to be provided
|
Low (ALARP)
|
|
|
|
|
|
∙ Poor illumination
|
∙ Fatality
|
· Proper cable
management system to be Followed
|
|
|
|
|
|
· Slip/trip/fall
|
• Cuts
|
· light post to be
secured from fall
|
|
|
|
|
|
|
|
· All materials to
be staged in proper manner without obstacles
|
|
|
|
|
|
18
|
Work Completion
|
· Poor housekeeping
|
· Fire
|
2
|
A
|
L
|
· General
housekeeping, Remove all surface, unwanted waste materials from the building
|
Low (ALARP)
|
|
|
|
|
|
· Slip/trip/fall
|
· All necessary
precautions will be adopted to prevent fire
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RISK MATRIX
|
|
Probability
|
|
|
|
|
|
A
|
B
|
C
|
D
|
E
|
|
|
|
Severity
|
People
|
Assets
|
Environment
|
Reputation
|
Improbable
|
Remote
|
Occasional
|
Probable
|
Frequent
|
|
|
|
1 in 100,000
|
1 in 10,000
|
1 in 1000
|
1 in 100 years
|
1 in 10 years
|
|
|
|
Years
|
Years
|
years
|
|
|
|
|
|
5-Catatrophic
|
Multiple fatalities
or permanent total disabilities
|
Extensive damage
|
Massive effect
|
International impact
|
|
|
|
|
|
|
|
4-Severe
|
Single
|
Major damage
|
Major effect
|
National impact
|
|
|
|
|
|
fatalities or
permanent total disabilities
|
High Risk
|
|
|
|
3-critical
|
Major injury or
health effects
|
Local damage
|
Localised effect
|
Considerable impact
|
|
Medium Risk
|
|
|
|
|
|
(ALARP)
|
|
|
|
2-Marginal
|
Minor
|
Minor damage
|
Minor effect
|
Minor impact
|
|
|
|
|
|
|
injury or health
effects
|
|
|
|
|
1-Negligble
|
Slight injury or
health effects
|
Slight Damage
|
Slight effect
|
Slight impact
|
Low Risk
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HIGH
|
3-E
|
|
|
|
|
|
|
|
|
|
4-C,D,E
|
|
|
|
|
|
|
|
|
|
5-B,C,D,E
|
|
|
|
|
|
|
|
|
|
MEDIUM
|
1-D,E
|
|
|
|
|
|
|
|
|
|
2-B,C,D,E
|
|
|
|
|
|
|
|
|
|
3-A,B,C,D
|
|
|
|
|
|
|
|
|
|
4-A,B
|
|
|
|
|
|
|
|
|
|
5-A
|
|
|
|
|
|
|
|
|
|
LOW
|
1-A,B,C
|
|
|
|
|
|
|
|
|
|
2A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECK
LIST FOR: TESTING & COMMISSIONING OF SPRINKLER SYSTEM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECK LIST FOR:
|
|
|
|
|
|
|
TESTING & COMMISSIONING OF SPRINKLER
SYSTEM
|
Ref.
No: FM-6012-0085/3
|
|
|
|
|
|
|
Rev.
No: 00
|
|
|
|
|
|
SUBCONTRACTOR
|
|
CONTRACTOR
|
Page :
|
|
|
|
|
|
SECTION
OF WORK: FIRE FIGHTING SYSTEM
LOCATION:
|
|
|
|
|
|
LEVEL:
WIR No.:
|
|
|
|
|
|
STAGE
|
ITEM
|
Checked by
|
Checked by
|
Date
|
|
|
|
|
|
S/C
|
CONT
|
CONS.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SETTING OUT
|
1.
Ensure all shop
drawings has been approved by the consultant.
|
|
|
|
|
|
|
|
|
|
2. Check Levels, elevations, distances &
supports & equipment are as per approved shop drawings & material
approvals.
|
|
|
|
|
|
|
|
|
|
3. Ensure all
material approvals & material verification records have been approved by
the consultant.
|
|
|
|
|
|
|
|
|
|
4. Only trained & experienced personnel
shall perform the work.
|
|
|
|
|
|
|
|
|
|
CIVIL
|
5. Ensure civil clearance has been issued
prior to start of any Testing & commissioning.
|
|
|
|
|
|
|
|
|
|
Pre- Commissioning
|
1.
Check the sprinkler
control valves are open/ tamper open.
|
|
|
|
|
|
|
|
|
|
2.
Check the trim piping
leak tight.
|
|
|
|
|
|
|
|
|
|
3.
Check control valves are
easily accessible.
|
|
|
|
|
|
|
|
|
|
4.
Check the signage /
identification tags are in place.
|
|
|
|
|
|
|
|
|
|
5.
Check the main check
valve holding pressure.
|
|
|
|
|
|
|
|
|
|
6.
Check the alarm check
valve exterior if free of damages.
|
|
|
|
|
|
|
|
|
|
7.
Check the water flow
switch operation.
|
|
|
|
|
|
|
|
|
|
8.
Check the alarm drain
drip tight.
|
|
|
|
|
|
|
|
|
|
9.
Check the trim valve is
in its proper location.
|
|
|
|
|
|
|
|
|
|
10. Check if the alarm test line valve is closed.
|
|
|
|
|
|
|
|
|
|
|
11. Check the fire breeching inlet plainly visible.
|
|
|
|
|
|
|
|
|
|
|
12. Check the fire breeching inlet if easily
accessible.
|
|
|
|
|
|
|
|
|
|
|
13. Check the fire breeching inlet caps/ plug are in
place.
|
|
|
|
|
|
|
|
|
|
Testing & Commissioning of Sprinkler System
|
1.
Verify that all
inspections for installation hydrostatic test have been completed &
accepted by the consultant. Show records if necessary.
|
|
|
|
|
|
|
|
|
|
2.
Verify that all manual
valves have been functionally checked & left in their operating position.
|
|
|
|
|
|
|
|
|
|
3.
Confirm that pressure
reducing valves set to the specified pressure downstream pressure as per the
hydraulic calculation.
|
|
|
|
|
|
|
|
|
|
4.
Confirm the time to ring
mechanical alarm from alarm check valve.
|
|
|
|
|
|
|
|
|
|
5.
Confirm time to ring
alarm from pressure switch.
|
|
|
|
|
|
|
|
|
|
6.
Confirm the interior
alarm inside the building is operating.
|
|
|
|
|
|
|
|
|
|
7.
Confirm the exterior
alarm for the building is in operation
|
|
|
|
|
|
|
|
|
|
8.
Confirm the water flow
devices are activated.
|
|
|
|
|
|
|
|
|
|
9.
Confirm the time to ring
alarm from the flow switch.
|
|
|
|
|
|
|
|
|
|
10.
Confirm all operating
devices & equipment is tested for proper functioning in accordance to
manufacturers’ recommendation.
|
|
|
|
|
|
|
|
|
|
Safety
|
11.
Confirm all safety
precautions have been met during the activity.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECK LIST FOR: INSTALLATION, TESTING & COMMISSIONING OF SPRINKLERS SYSTEM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECK
LIST FOR:
|
Ref.
No:
|
|
|
|
|
|
INSTALLATION,
TESTING & COMMISSIONING OF
SPRINKLERS SYSTEM
|
Rev.
No: 0
|
|
|
|
|
|
|
|
|
Page : 1
of 1
|
|
|
|
|
|
SUBCONTRACTOR
|
CONTRACTOR
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION
OF WORK: Fire Fighting
LOCATION:
|
|
|
|
|
|
LEVEL:
WIR No.:
|
|
|
|
|
|
STAGE
|
ITEM
|
Checked by
|
Checked by
|
Date
|
|
|
|
|
|
S/C
|
CONT
|
CONS.
|
|
|
|
|
|
|
SETTING OUT
|
Check
Layout
|
|
|
|
|
|
|
|
|
|
MEP/CIVIL
|
Check
for Services Clearances
|
|
|
|
|
|
|
|
|
|
INSTALLATION
|
1.
Check
the installation is as per working / contract drawings.
|
|
|
|
|
|
|
|
|
|
INSTALLATION
|
2.
Verify the pipework
been hydro tested.
|
|
|
|
|
|
|
|
|
|
3.
Check
the sprinkler system control valves and all other valves and installed or
closed position.
|
|
|
|
|
|
|
|
|
|
4.
Check the
control valves in the open position equipped with tamper switch.
|
|
|
|
|
|
|
|
|
|
5.
Check
the sprinklers are free from corrosion, or obstruction to spray discharge.
|
|
|
|
|
|
|
|
|
|
6.
Check the
sprinklers are of proper temperature rating in their locations.
|
|
|
|
|
|
|
|
|
|
7.
Check
the alarm valve, fittings, controls and accessories have been installed
correctly.
|
|
|
|
|
|
|
|
|
|
8.
Check that damaged sprinklers are replaced
with new one.
|
|
|
|
|
|
|
|
|
|
9.
Check
that potable water supplies have correct type of backflow preventer.
|
|
|
|
|
|
|
|
|
|
10.
Check
wet pipe sprinkler system filled with water.
|
|
|
|
|
|
|
|
|
|
11.
Ensure
that the pressure gauges are installed following locations – Main fire protection riser and top of each riser and
before / after each PRV.
|
|
|
|
|
|
|
|
|
|
SAFETY
|
12.
Ensure
all Safety precautions have been fulfilled during the activity.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECK
LIST FOR: TESTING FOR FIRE FIGHTING
PIPING SYSTEM
|
|
|
|
|
|
(Wet and
Sprinkler Network) AND ACCESSORIES
|
|
|
|
|
|
|
|
|
|
|
|
CHECK
LIST FOR:
|
|
|
|
|
|
|
|
Ref.
No:
|
|
|
|
|
|
TESTING
FOR FIRE FIGHTING PIPING SYSTEM (Wet and Sprinkler Network) AND ACCESSORIES
|
Rev.
No: 0
|
|
|
|
|
|
(HYDROSTATIC TEST REPORT)
|
Page : 1
of 1
|
|
|
|
|
|
|
|
|
|
|
|
|
SUBCONTRACTOR
|
CONTRACTOR
|
LOGO
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTION
OF WORK: Fire Fighting
LOCATION:
|
|
|
|
|
|
LEVEL:
WIR No.:
|
|
|
|
|
|
Building
|
|
|
|
|
|
|
|
Drawing No.
|
|
|
|
|
|
|
|
|
|
|
|
|
Type of Test
|
Hydro R
|
Test Medium
|
Water R
|
|
|
|
|
|
|
|
|
|
PIPING SYSTEM
|
|
FIRE PROTECTION PIPE WORKS
|
|
|
|
|
|
AREA/LOCATION
|
|
|
|
|
|
|
|
|
|
|
|
|
WORKING PRESSURE
|
|
|
|
|
|
|
|
TEST PRESSURE
|
|
|
(1.5 Times the
Working Pressure)
|
|
|
|
|
|
MINIMUM AMBIENT
TEMP.
|
|
|
|
|
|
|
|
|
|
|
|
|
TEST MEDIUM TEMP.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DATE OF TEST
|
|
|
|
|
|
DURATION OF TEST
|
|
MINIMUM 2 HOURS
|
|
|
|
|
|
|
|
|
TESTING FLUID/GAS
|
|
WATER
|
|
|
|
|
|
|
|
|
|
START TIME
|
|
|
FINISH TIME
|
|
|
|
|
|
|
|
|
|
INITIAL PRESSURE:-
|
|
FINAL PRESSURE:-
|
|
|
|
|
|
|
|
|
PRESSURE GAUGE NO.:-
|
|
CAL. DUE DATE :-
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|