Installation Testing Commissioning of Sprinkler System
METHOD STATEMENT FOR INSTALLATION,TESTING & COMMISSIONING OF SPRINKLER SYSTEM
Please click below link for this season: http://bhadrafiresafety.blogspot.com/2023/01/method-statement-for-itc-of-sprinkler.html
Risk
Assessment - Installation Testing Commissioning Of Sprinkler System |
|
|||||||||||
Serial |
Sub-Activities |
Hazards Identified |
Risks
Involved |
Risk
Rating |
Control
Measures |
Residual
Risk |
|
|||||
No. |
(Generic & Task) |
(People
& Property) |
Severity |
Probability |
Initial
Risk |
|
||||||
1 |
Prepare work area |
· Unauthorized, untrained
workers |
|
2 |
A |
L |
· TBT/DSTI to be conducted by the foreman/ safety officer prior to work commencement |
Low (ALARP) |
|
|||
· Cuts |
· Task specific safety training to be provided |
|
||||||||||
· Abrasions |
· Authorized personnel to undertake the job |
|
||||||||||
|
· Daily safety
inspection should be carried and eliminate the hazard. |
|
||||||||||
2 |
Manual Handling |
· Incorrect lifting of loads |
· Back Injuries |
3 |
C |
M |
· Any lifting tasks
shall be carried out by persons physically capable to do so |
Low (ALARP) |
|
|||
• No employee should
be asked to carry loads |
|
|||||||||||
above his capacity and in any case no load
shall exceed 30kg per man. |
|
|||||||||||
• Mass of the load
is more then to be equally shared |
|
|||||||||||
· Deploy enough number
of personnel for lifting shall be appointed to the task depending upon the type of load to be lifted. |
|
|||||||||||
·Use easy mode of transport like trolley etc. |
|
|||||||||||
• Load not to be
lifted above your shoulder height |
|
|||||||||||
• Keep your fingers
away from pinch point While placing
the load |
|
|||||||||||
• Area to be
illuminated with adequate lighting. |
|
|||||||||||
• PPE to be worn at
all times. (helmet, shoe, overall, vest, gloves, goggles, mask) |
|
|||||||||||
3 |
Transportation of
materials to site using with trailer, pickup, fork lift and crane |
• Unauthorized, Untrained Workers |
• Fatality |
4 |
C |
H |
• Ensure the crane and forklift engaged is tested and having valid
license and the operator has valid license and approved 3rd party
certificate. |
M |
|
|||
• Engage trained and
certified banks man. |
|
|||||||||||
• Barrication and
warning signs in to the area where lifting operation is carried out and
restrict the entry. |
|
|||||||||||
• Check list should
be carried out to their vehicles by
the operator prior to start any work |
|
|||||||||||
• Use tagline for control of swing and alignment. |
|
|||||||||||
• The crane must be stopped when the wind
speed exceeds 38km/hr. |
|
|||||||||||
• SWL should be clearly marked on the crane and
should be check that is functioning. |
|
|||||||||||
• The crane and trucks shall be periodically maintained and a
periodical check has been done by the maintenance team. |
|
|||||||||||
·Vehicle
not to be left unattended at site (ie,to be switch off mode if required and
keys removed) |
|
|||||||||||
• SWL shall not be exceeded. |
|
|||||||||||
• Load should be secured properly with the equipment. |
|
|||||||||||
• Operators and rigger must wear high level of reflecting vest and
adequate PPE ( Shoe, helmet, leather gloves, goggles, over all ) |
|
|||||||||||
·Vehicle
routes to be kept free of obstructions (with spillages being cleaned up
promptly) |
|
|||||||||||
·Any
reversing that is necessary should be overseen by a trained flagman / Banks
man. |
|
|||||||||||
·
Operator should follow the site speed limit and obey the traffic
rules. |
|
|||||||||||
• Colour coded system to be implemented to all lifting equipments as
per the month. |
|
|||||||||||
• Colour coded system to be implemented to all lifting equipments as
per the month. |
|
|||||||||||
4 |
Stacking and Storing |
∙ Unauthorized,
untrained workers |
• Crush |
3 |
B |
M |
· All materials shall
be stored below 2 meter height. |
Low (ALARP) |
|
|||
· If the material is too heavy, use hydraulic trolley to shift the material. |
|
|||||||||||
• No storage of
materials to be done in the work place, only required quantity to be taken
for the job. |
|
|||||||||||
• Personnel
protective equipment must wear at all time during the activity. (Helmet,
shoe, vest, overall, gloves, goggles, mask.) |
|
|||||||||||
5 |
Installation of
sprinkler system and accessories |
• Untrained, unauthorized |
• Cut and abrasion |
3 |
C |
M |
· Authorized
personnel to undertake the job |
Low (ALARP) |
|
|||
∙Work
location shall be inspected by concerned supervisor /
foreman. |
|
|||||||||||
• PPE to be worn at
all times( Gloves, goggles, mask, helmet, shoe, vest, overall) |
|
|||||||||||
· Deploy enough number
of personnel for material lifting shall be appointed to the
task depending upon the distance |
|
|||||||||||
• Materials should
not kept in walkways, edge of the
opening. |
|
|||||||||||
• Close supervision
to be done at all times |
|
|||||||||||
• Proper
communication to be maintained between
the workers while doing the installation |
|
|||||||||||
• Maintain a good
housekeeping policy to prevent from
slip, trip, and fall hazards. |
|
|||||||||||
6 |
Working in near
floor openings |
· Material/equipment fall from height |
·Fatality |
4 |
B |
M |
• PTW to be applied
and obtained prior to start work |
Low (ALARP) |
|
|||
∙ Rigid barrication and toe
board to be provided to all external edges and where a fall can occur. |
|
|||||||||||
• Authorized person
to do the job. |
|
|||||||||||
•Warning signboards
to be provided in those areas. |
|
|||||||||||
· PPE to be used at all times ( Helmet,
Shoes, Vest, Overall, Harness ) |
|
|||||||||||
7 |
Working with Hand
tools ( Hack saw, torch wrench, hammer ) |
• Slip, trip and fall |
• Fatigue |
3 |
C |
M |
• Defective tools
should not be issued or used to perform the task, to be checked by store
keeper |
Low (ALARP) |
|
|||
• Don’t extend the
spanner by using a pipe as an extension bar |
|
|||||||||||
• Never use a screw
driver as a chisel |
|
|||||||||||
•Hand tools shall be
free from oil, grease & etc. |
|
|||||||||||
• Chisel’s head
shall have safety cap to avoid finger
injury. |
|
|||||||||||
• Use eye/ face
protection when there is flying materials hazard, wear gloves while required
to protect the hands |
|
|||||||||||
• Never use a file
as a lever |
|
|||||||||||
• Use right tools
for the job |
|
|||||||||||
8 |
Working with power
tools ( Drill, grinding, pipe cutting machine ) |
• Defective equipment |
• Hearing losses |
3 |
C |
M |
• PTW to be applied
and obtained prior to start, If spark producing activity is performed |
M (ALARP) |
|
|||
· All portable power
tools should be fitted with adequate fuse protection either in the tool body
or in its electrical plug. |
|
|||||||||||
· Defective tools
should not be issued or used to perform a task. |
|
|||||||||||
· All portable power tools should be fitted with adequate fuse
protection either in the tool body or in its electrical plug. |
|
|||||||||||
• Monthly inspection
should be carried out by the electrician and record to be kept at the store |
|
|||||||||||
· The weight, size and type of tool should be selected to suit the job
being carried out. |
|
|||||||||||
• Don’t lay the
cables around the access way, it should be proper routing |
|
|||||||||||
• Industrial
distribution board and socket only to be used at site |
|
|||||||||||
• No joints shall be
made in electrical cable. |
|
|||||||||||
• Cable hangers
shall be used to avoid the direct
contact of power tools cable with the scaffolding members. |
|
|||||||||||
• Electrical
connection shall be routed through
ELCB only. |
|
|||||||||||
• Correct rate of
ELCB should be used ( Ex:-30ma only acceptable) |
|
|||||||||||
· Only those persons who have been adequately trained and experienced
in the use of the tool should be allowed to use the same. Power tools shall have inspection sticker. |
|
|||||||||||
· Tools should be stored and maintained in good working condition. |
|
|||||||||||
· Appropriate PPE
Should use ( Goggles, Mask, Ear plug, Gloves, Shoe, Helmet, Overall, Vest ) |
|
|||||||||||
9 |
Working with ladder |
• Person/ material falling from height |
• Sprain and strain |
3 |
C |
M |
• The ladder should
extend minimum one meter from the top
for safe movement |
Low (ALARP) |
|
|||
• Heavy materials
should not be carried |
|
|||||||||||
• Do not erect in
slippery, uneven surface |
|
|||||||||||
• Should be set up
with a 4 vertical to 1 horizontal
slope ( 4:1 ) |
|
|||||||||||
• Inspection and
maintenance to be registered and
recorded by the store keeper |
|
|||||||||||
• Remember the 3
point contact. |
|
|||||||||||
• Step ladder must
fully open and lock and the devices to be as per manufacturer |
|
|||||||||||
• Ladder to be used
for short duration works only limited
to 15 min. |
|
|||||||||||
• Defective ladder
should not be used and report it
immediately |
|
|||||||||||
• Do not work from
the top of two rungs |
|
|||||||||||
• Do not work in
front of the door. If work is carried then locked the door or blocked off |
|
|||||||||||
• Colour coded
system to be implemented |
|
|||||||||||
10 |
Working on mobile
scaffold |
• Uneven surface |
• Sprain and strain |
3 |
C |
M |
• Do not stack
materials on to the scaffold |
Low (ALARP) |
|
|||
• Visual inspection
should carry before use |
|
|||||||||||
• Out rigger fitted
and breaks are locked on |
|
|||||||||||
• Only trained
scaffolders shall be involved in erection & dismantling activities. |
|
|||||||||||
• Keep walkways free
of obstacles, tools and equipment |
|
|||||||||||
• No person to be on
the scaffold while it is being moved |
|
|||||||||||
• Mobile scaffold
height should be restricted to 3.5 to
4 times the shortest base width, If height of scaffold exceeds raker support
or it should be tied to the structure
properly. |
|
|||||||||||
• Safety harness to
be used above 2mtr height and anchored in above shoulder height at all time |
|
|
||||||||||
• Scaffold only use
in on level and surface area |
|
|||||||||||
• Tagging system to
be implemented ( i.e., all safe scaffolds shall be provided with green tags
and unsafe scaffolds with red tag ) |
|
|||||||||||
• Never stand and
sit on the hand rails |
|
|||||||||||
11 |
Handling chemicals
(Solvent cement) |
• Unauthorized, untrained workers |
· Skin injury |
3 |
C |
M |
· Ensure the chemicals are stored as per the manufacturer recommendation and identification. |
Low (ALARP) |
|
|||
•Adequate lighting
and ventilation to be provided |
|
|||||||||||
• MSDS to be
referred prior and to follow the
manufacturer instruction |
|
|||||||||||
• Trained and
authorized person to do the job |
|
|||||||||||
• Only required
quantity to take for the work |
|
|||||||||||
• Do not store
chemicals at non designated areas. |
|
|||||||||||
• Old/ empty
container return to store for proper
Dispose |
|
|||||||||||
• Container should
check for leakage before Handling |
|
|||||||||||
•
Personnel hygiene to be maintained while after use of chemicals |
|
|||||||||||
• All spillage shall
be clean by sand or other absorbent
materials |
|
|||||||||||
• Rubber gloves,
overall, helmet, vest, shoe, Goggles, mask to be worn while during the
activity |
|
|||||||||||
12 |
Welding work (arc) |
• Fire |
•Electric Shock |
4 |
C |
H |
• PTW to be applied
and obtained prior to start, If spark
producing activity is performed |
Low (ALARP) |
|
|||
• Certified person
only undertake the welding job |
|
|||||||||||
• All Flammable
/combustible materials should be removed from the area where welding &
gas cutting operations are carried out. |
|
|||||||||||
• Fire blankets
should be used to contain sparks and molten metal’s within the floor and
should not be allowed to fall from height. |
|
|||||||||||
• Warning signs and
boards should be provided And area to be well barricaded |
|
|||||||||||
• Appropriate fire
extinguisher should be placed in to
the work area ( Dry powder, CO2, Fire blanket ) |
|
|||||||||||
• Adequate lighting
and ventilation to be Provided. |
|
|||||||||||
• Close supervision
to be done at all times. |
|
|||||||||||
• Hoses should be of
approved type and should be free. |
|
|||||||||||
·Appropriate PPE
Should use ( Welding helmet, Dust mask, Goggles, Gloves, Shoe, Helmet,
Overall, Vest ) |
|
|||||||||||
13 |
Operating
with Thread Machine |
·Defective Machine |
• Cuts |
3 |
C |
M |
• Polythene sheets
to be laid and drip trays to be placed below the machine to prevent
spillages. |
M (ALARP) |
|
|||
• Defective machine
should not be used to perform a task. |
|
|||||||||||
• Only those persons
who have been adequately trained and experienced
in the use of the machine should be allowed to use the same. |
|
|||||||||||
• Machine should be
maintained in good working Condition. |
|
|||||||||||
• All spillages must
be clean immediately |
|
|||||||||||
• Waste oil should
be disposed in an approved |
|
|||||||||||
Manner. |
|
|||||||||||
• Operator should
check the machine condition prior to start the work. |
|
|||||||||||
• Adequate lighting
and ventilation to be Provided. |
|
|||||||||||
• Don’t lay the
cables around the access way, it should be proper routing |
|
|||||||||||
• Industrial
distribution board and socket only to be used at site |
|
|||||||||||
• No joints shall be
made in electrical cable. |
|
|||||||||||
• Electrical
connection shall be routed through
ELCB only and should be used ( Ex:-30ma only acceptable) |
|
|||||||||||
• Fire extinguisher
to be provided |
|
|||||||||||
• Area to be
barricade and provide signage. |
|
|||||||||||
14 |
Working with electricity |
• Electricity |
• Electrocution or |
4 |
B |
M |
• Only those persons who have been
adequately trained and certified in the work of electricity to allow for the
same. |
Low (ALARP) |
|
|||
• Temporary live
cable management plan shall develop and implement during the activity. |
|
|||||||||||
• Defective tools and equipment should not be used, report it and
replaced it immediately. |
|
|||||||||||
• Electrical work
shall not carry out in wet Conditions. |
|
|||||||||||
• Barricade the location and signage to be placed where circuits and
equipments are energized. |
|
|||||||||||
• Lock out tag out (
LOTO) procedure to be followed during
testing & commissioning. |
|
|||||||||||
• Do not overload to
the circuits. |
|
|||||||||||
• Communicate to all
personnel about testing &
commissioning. |
|
|||||||||||
• Don’t use homemade electrical accessories and use industrial type
only. |
|
|||||||||||
• Disconnect main supply before
commencing of work. |
|
|||||||||||
• PPE should worn at all time
where working in energized circuits. ( Insulated gloves, Electric resistivity
shoe ) |
|
|||||||||||
15 |
Flushing, pressure and leakage testing |
• Untrained, unauthorized Workers |
• Fatality |
4 |
B |
M |
• PTW to be applied and obtained prior to start work |
Low (ALARP) |
|
|||
• Calibrated pressure gauge only to be used for pressure testing |
|
|||||||||||
• Never pressure test the system/ pipe above its designed pressure. |
|
|||||||||||
• Proper lighting to be provided in around the working area. |
|
|||||||||||
• Never do hot work on a pressurized system ( always de-pressurize ) |
|
|||||||||||
•
Calibrated instrument only to be used. |
|
|||||||||||
• Close supervision to be done at all times |
|
|||||||||||
• Use always regulators and never pressurize the system directly
without regulator. |
|
|||||||||||
• Warning signs and boards should be provided And area to be well barricaded |
|
|||||||||||
∙Only
qualified and trained person to do the job. |
|
|||||||||||
• Emergency
procedure to be briefed to all personnel prior to start the activity. |
|
|||||||||||
• Emergency
evacuation plan shall be readily available according to site condition and
briefed to the workforce prior to start. |
|
|||||||||||
•
Trained first aider, fire warden and emergency vehicle to be available at the
site during the activity. |
|
|||||||||||
• All personnel’s
involved shall be made aware of first aid treatment related to electric
injuries. |
|
|||||||||||
16 |
Working in hot
weather |
∙ Heat Stress |
|
2 |
B |
M |
· Drink plenty of water |
Low (ALARP) |
|
|||
∙ Dehydration |
∙ Employees shall be trained about heat
stress symptoms & first aid measures. |
|
||||||||||
· Sunburn |
· Avoid highly physical tasks during the hottest part of the day |
|
||||||||||
· Skin Cancer |
· Isotonic drinks to be provided |
|
||||||||||
|
• Provide sufficient
rest breaks based on the humidity
& temperature conditions |
|
||||||||||
17 |
While working at
night shift |
|
|
3 |
B |
M |
· Proper illumination
to be provided |
Low (ALARP) |
|
|||
∙ Poor illumination |
∙ Fatality |
· Proper cable
management system to be Followed |
|
|||||||||
· Slip/trip/fall |
• Cuts |
· light post to be
secured from fall |
|
|||||||||
|
|
· All materials to
be staged in proper manner without obstacles |
|
|||||||||
18 |
Work Completion |
· Poor housekeeping |
· Fire |
2 |
A |
L |
· General
housekeeping, Remove all surface, unwanted waste materials from the building |
Low (ALARP) |
|
|||
· Slip/trip/fall |
· All necessary
precautions will be adopted to prevent fire |
|
||||||||||
|
||||||||||||
|
||||||||||||
RISK MATRIX |
|
Probability |
|
|||||||||
|
|
A |
B |
C |
D |
E |
|
|||||
Severity |
People |
Assets |
Environment |
Reputation |
Improbable |
Remote |
Occasional |
Probable |
Frequent |
|
||
1 in 100,000 |
1 in 10,000 |
1 in 1000 |
1 in 100 years |
1 in 10 years |
|
|||||||
Years |
Years |
years |
|
|
|
|||||||
5-Catatrophic |
Multiple fatalities
or permanent total disabilities |
Extensive damage |
Massive effect |
International impact |
|
|
|
|||||
4-Severe |
Single |
Major damage |
Major effect |
National impact |
|
|
||||||
fatalities or
permanent total disabilities |
High Risk |
|||||||||||
3-critical |
Major injury or
health effects |
Local damage |
Localised effect |
Considerable impact |
|
Medium Risk |
|
|
||||
(ALARP) |
||||||||||||
2-Marginal |
Minor |
Minor damage |
Minor effect |
Minor impact |
|
|
|
|||||
injury or health
effects |
|
|||||||||||
1-Negligble |
Slight injury or
health effects |
Slight Damage |
Slight effect |
Slight impact |
Low Risk |
|
||||||
HIGH |
3-E |
|||||||||||
4-C,D,E |
||||||||||||
5-B,C,D,E |
||||||||||||
MEDIUM |
1-D,E |
|||||||||||
2-B,C,D,E |
||||||||||||
3-A,B,C,D |
||||||||||||
4-A,B |
||||||||||||
5-A |
||||||||||||
LOW |
1-A,B,C |
|||||||||||
2A |
||||||||||||
CHECK
LIST FOR: TESTING & COMMISSIONING OF SPRINKLER SYSTEM |
||||||||||||
CHECK LIST FOR: |
|
|||||||||||
TESTING & COMMISSIONING OF SPRINKLER
SYSTEM |
Ref.
No: FM-6012-0085/3 |
|||||||||||
|
Rev.
No: 00 |
|||||||||||
SUBCONTRACTOR |
|
CONTRACTOR |
Page : |
|||||||||
SECTION
OF WORK: FIRE FIGHTING SYSTEM
LOCATION: |
||||||||||||
LEVEL:
WIR No.: |
||||||||||||
STAGE |
ITEM |
Checked by |
Checked by |
Date |
||||||||
S/C |
CONT |
CONS. |
|
|||||||||
|
|
|
|
|
|
|||||||
SETTING OUT |
1.
Ensure all shop
drawings has been approved by the consultant. |
|
|
|
|
|||||||
2. Check Levels, elevations, distances &
supports & equipment are as per approved shop drawings & material
approvals. |
|
|
|
|
||||||||
3. Ensure all
material approvals & material verification records have been approved by
the consultant. |
|
|
|
|
||||||||
4. Only trained & experienced personnel
shall perform the work. |
|
|
|
|
||||||||
CIVIL |
5. Ensure civil clearance has been issued
prior to start of any Testing & commissioning. |
|
|
|
|
|||||||
Pre- Commissioning |
1.
Check the sprinkler
control valves are open/ tamper open. |
|
|
|
|
|||||||
2.
Check the trim piping
leak tight. |
|
|
|
|
||||||||
3.
Check control valves are
easily accessible. |
|
|
|
|
||||||||
4.
Check the signage /
identification tags are in place. |
|
|
|
|
||||||||
5.
Check the main check
valve holding pressure. |
|
|
|
|
||||||||
6.
Check the alarm check
valve exterior if free of damages. |
|
|
|
|
||||||||
7.
Check the water flow
switch operation. |
|
|
|
|
||||||||
8.
Check the alarm drain
drip tight. |
|
|
|
|
||||||||
9.
Check the trim valve is
in its proper location. |
|
|
|
|
||||||||
10. Check if the alarm test line valve is closed. |
|
|
|
|
||||||||
|
11. Check the fire breeching inlet plainly visible. |
|
|
|
|
|||||||
|
12. Check the fire breeching inlet if easily
accessible. |
|
|
|
|
|||||||
|
13. Check the fire breeching inlet caps/ plug are in
place. |
|
|
|
|
|||||||
Testing & Commissioning of Sprinkler System |
1.
Verify that all
inspections for installation hydrostatic test have been completed &
accepted by the consultant. Show records if necessary. |
|
|
|
|
|||||||
2.
Verify that all manual
valves have been functionally checked & left in their operating position. |
|
|
|
|
||||||||
3.
Confirm that pressure
reducing valves set to the specified pressure downstream pressure as per the
hydraulic calculation. |
|
|
|
|
||||||||
4.
Confirm the time to ring
mechanical alarm from alarm check valve. |
|
|
|
|
||||||||
5.
Confirm time to ring
alarm from pressure switch. |
|
|
|
|
||||||||
6.
Confirm the interior
alarm inside the building is operating. |
|
|
|
|
||||||||
7.
Confirm the exterior
alarm for the building is in operation |
|
|
|
|||||||||
8.
Confirm the water flow
devices are activated. |
|
|
|
|
||||||||
9.
Confirm the time to ring
alarm from the flow switch. |
|
|
|
|
||||||||
10.
Confirm all operating
devices & equipment is tested for proper functioning in accordance to
manufacturers’ recommendation. |
|
|
|
|
||||||||
Safety |
11.
Confirm all safety
precautions have been met during the activity. |
|
|
|
|
|||||||
|
||||||||||||
CHECK LIST FOR: INSTALLATION, TESTING & COMMISSIONING OF SPRINKLERS SYSTEM |
||||||||||||
CHECK
LIST FOR: |
Ref.
No: |
|||||||||||
INSTALLATION,
TESTING & COMMISSIONING OF
SPRINKLERS SYSTEM |
Rev.
No: 0 |
|||||||||||
|
|
|
Page : 1
of 1 |
|||||||||
SUBCONTRACTOR |
CONTRACTOR |
|
||||||||||
|
|
|
||||||||||
SECTION
OF WORK: Fire Fighting
LOCATION: |
||||||||||||
LEVEL:
WIR No.: |
||||||||||||
STAGE |
ITEM |
Checked by |
Checked by |
Date |
||||||||
S/C |
CONT |
CONS. |
|
|||||||||
SETTING OUT |
Check
Layout |
|
|
|
|
|||||||
MEP/CIVIL |
Check
for Services Clearances |
|
|
|
|
|||||||
INSTALLATION |
1.
Check
the installation is as per working / contract drawings. |
|
|
|
|
|||||||
INSTALLATION |
2.
Verify the pipework
been hydro tested. |
|
|
|
|
|||||||
3.
Check
the sprinkler system control valves and all other valves and installed or
closed position. |
|
|
|
|
||||||||
4.
Check the
control valves in the open position equipped with tamper switch. |
|
|
|
|
||||||||
5.
Check
the sprinklers are free from corrosion, or obstruction to spray discharge. |
|
|
|
|
||||||||
6.
Check the
sprinklers are of proper temperature rating in their locations. |
|
|
|
|
||||||||
7.
Check
the alarm valve, fittings, controls and accessories have been installed
correctly. |
|
|
|
|
||||||||
8.
Check that damaged sprinklers are replaced
with new one. |
|
|
|
|
||||||||
9.
Check
that potable water supplies have correct type of backflow preventer. |
|
|
|
|
||||||||
10.
Check
wet pipe sprinkler system filled with water. |
|
|
|
|
||||||||
11.
Ensure
that the pressure gauges are installed following locations – Main fire protection riser and top of each riser and
before / after each PRV. |
|
|
|
|
||||||||
SAFETY |
12.
Ensure
all Safety precautions have been fulfilled during the activity. |
|
|
|
|
|||||||
CHECK
LIST FOR: TESTING FOR FIRE FIGHTING
PIPING SYSTEM |
||||||||||||
(Wet and
Sprinkler Network) AND ACCESSORIES |
||||||||||||
|
||||||||||||
CHECK
LIST FOR: |
|
|||||||||||
|
Ref.
No: |
|||||||||||
TESTING
FOR FIRE FIGHTING PIPING SYSTEM (Wet and Sprinkler Network) AND ACCESSORIES |
Rev.
No: 0 |
|||||||||||
(HYDROSTATIC TEST REPORT) |
Page : 1
of 1 |
|||||||||||
|
|
|||||||||||
SUBCONTRACTOR |
CONTRACTOR |
LOGO |
|
|||||||||
|
||||||||||||
|
||||||||||||
SECTION
OF WORK: Fire Fighting
LOCATION: |
||||||||||||
LEVEL:
WIR No.: |
||||||||||||
Building |
|
|
||||||||||
Drawing No. |
|
|||||||||||
|
||||||||||||
Type of Test |
Hydro R |
Test Medium |
Water R |
|||||||||
PIPING SYSTEM |
FIRE PROTECTION PIPE WORKS |
|||||||||||
AREA/LOCATION |
|
|
|
|
|
|
||||||
WORKING PRESSURE |
|
|||||||||||
TEST PRESSURE |
|
(1.5 Times the
Working Pressure) |
||||||||||
MINIMUM AMBIENT
TEMP. |
||||||||||||
|
||||||||||||
TEST MEDIUM TEMP. |
||||||||||||
|
|
|
|
|
|
|||||||
DATE OF TEST |
||||||||||||
DURATION OF TEST |
MINIMUM 2 HOURS |
|
|
|
||||||||
TESTING FLUID/GAS |
WATER |
|
|
|
|
|||||||
START TIME |
|
|
FINISH TIME |
|
|
|
|
|||||
INITIAL PRESSURE:- |
|
FINAL PRESSURE:- |
|
|
|
|||||||
PRESSURE GAUGE NO.:- |
|
CAL. DUE DATE :- |
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
QUALITY CONTROL
PROCEDURE FOR INSTALLATION, TESTING & COMMISSIONING OF
SPRINKLERS SYSTEM
CONTENTS
·
SCOPE
·
PURPOSE
·
REFERENCES
·
DEFINITIONS
·
RESPONSIBILITIES
·
PROCEDURE
· ATTACHMENTS
1.0 SCOPE:
This procedure applies to all the inspection activities
related to monitoring and measurement of products and Processes related for the
Installation or testing of subject activity where applicable for the project
and Applicable to:
·
Method Statement.
·
Quality Control
Procedure.
·
Inspection and Test
Plans.
·
Risk Assessments
·
FORMS.
2.0 PURPOSE:
The purpose of this procedure is to :
o
Identify processes /
products those are to be installed before using them in intended application.
o
Define the methods to
verify the quality of products and ensure that products that meet the stated
requirements are only used in the intended application.
o Define the responsibilities of concerned personnel related to quality control processes.
3.0 REFERENCES
Project Quality Plan
Material Approvals
4.0 DEFINITIONS:
PQP : Project
Quality Plan.
PSP : Project
Safety Plan.
QCP : Quality
Control Procedure.
HSE : Health,
Safety and Environment
MS : Method
Statement
ITP :
Inspection Test Plan
QA/QC : Quality
Assurance / Quality Control Engineer.
SK : Store
Keeper
WIR : Work Inspection Request
MIR : Material
Inspection Request.
MAR : Material Approval Request
5.0
RESPONSIBILITIES:
5.1 Project Manager
-
Project Manager is the
overall responsible for the project in terms of work execution, safety,
planning & quality. The Project Manager will maintain the planning progress
and coordination of works with the main contractor.
-
The work progress shall be carried out as per
planned program and all the equipment’s required to execute the works shall be
available and in good condition as per project planned.
-
Specific attention is paid to all safety measures
and quality control in coordination with Safety Engineer and QA/QC Engineer and
in line with PSP and PQP.
5.2 Construction Manager
-
Construction Manager is responsible to supervise
and control the work on site.
-
Coordinating with QA/QC Engineer and site Team
and foremen for all activities on site.
-
Control and sign all WIR’s before issuing to Consultant
approval.
5.3 Site Engineer
-
The method of statement to the system shall be
implemented according to the Consultant project specifications and approved
shop drawings.
-
Provision of all necessary information and
distribution of responsibilities to his Construction team.
-
The work progress shall be monitored in
accordance with the planned work program and he will provide reports to his
superiors.
-
The constant coordination with the Safety
Engineer to ensure that the works are carried out in safe working atmosphere.
-
The constant coordination with the QA/QC Engineer
for any works to be carried out and initiate for the Inspection for the
finished works.
-
He will ensure the implementation of any request
that might be raised by the Consultant.
-
Efficient daily progress shall be obtained for
all the equipment and manpower.
-
He will engage in the work and check the same
against the daily report received from the Foremen.
-
The passage of all the revised information to the
Foremen and ensure that it’s being carried out properly.
5.4 QA/QC Engineer (MEP):
-
The monitoring of executions of works at site and
should be as per the approved shop drawings and project specifications.
-
Ensure WIRs and MIRs are being raised for
activities in timely manner and inspected by the Consultant.
-
Check and insure that all activities / work done
/ completed prior to offer for consultant inspection.
-
He will follow and carried out all the relevant
tests as per project specifications.
-
Obtain the required clearance prior to Consultant’s
inspections.
-
Should acquire any necessary civil works
clearances and coordination.
-
Coordinate with site construction team.
-
One who will assist the Consultant Engineer /
Inspector during inspection.
5.5 Site Foreman
-
The carrying-out of work and the proper
distribution of all the available resources in coordination with the Site
Engineer on a daily basis.
-
Daily reports of the works are achieved and
coordinated for the future planning with the Site Engineer.
-
Incorporate all the QA/QC and Safety requirements
as requested by the concerned Engineer.
-
Meeting with any type of unforeseen incident or
requirement and reporting the same to the Site Engineer immediately.
5.6 Safety Officer
-
The implementation of all safety measures in
accordance with the HSE plan and that the whole work force is aware of its
proper implementation.
-
The implementation of safety measures is adequate
to maintain a safe working environment on the work activity.
-
Inspection of all the site activities and
training personnel in accident prevention and its proper reporting to the
Construction Manager and the Project Manager.
-
The site is maintained in a clean and tidy
manner.
-
Ensure only trained persons shall operate the
power tools.
-
Ensure all concerned personals shall use PPE and
all other items as required.
-
Ensure adequate lighting is provided in the
working area at night time.
-
Ensure high risk elevated areas are provided are
barricade, tape, safety nets and provided with ladders.
-
Ensure service area/inspection area openings are
provided with barricade, tape, and safety nets.
-
Ensure safe access to site work at all times.
5.8 Store Keeper (SK)
- Responsible
for overall Store operations in making sure to store the material delivery to
the site and keep it in suitable area that will keep the material in safe from
rusty and damage.
- One who will acknowledge the receiving of materials at site in coordination with QA/QC and concerned Engineer.
5.9 Emergency Absents
-
If QA/QC not available the adequate QA/QC Engineer
will be responsible for quality control activities.
-
If the P.M. not available the Construcion manager
will be resposible for all of his activities.
-
If the HSE Engineer not available the adequate HSE
Engineer are resposible for safety activities.
-
If Engineer not available Construction manager will
assign his duties to the concerned supervisor, forman or alternate Engineer.
- Replacing staff, in case of absent, with another designation can be accepted only for a minimum period of days absent otherwise the Contractor shall replace the relevant person with same designation which required approval from CONSULTANT.
6.0 PROCEDURE:
-
Check that all the following documentations have
been approved by the Consultant to proceed with the installation activities:
· Quality Control Procedure
· Method Statement
· Inspection Test Plan
· Check List
· Risk Assessment
· Shop Drawing Submittals related to work
- Check all the delivered materials are
inspected and approved by the Consultant’s Engineer.
- Ensure that the respective work area has
been cleared by previous trades for start-up installing the system.
- Ensure that the installation of the
material is as per approved shop drawings, approved method statement,
Manufacturer’s recommendation, and prevailing quality standards.
- Ensure the following checks are performed
during the installation progress:
- Check all materials are as per approved
submittal.
- Check all Material are installed as per
approved shop drawings.
- Check if coordinated with other services.
- Check installation if it is carried out as
per approved method statement.
- Check that the system checked and approved
by Consultant.
- Ensure WIRs are issued on time without
delay. (Min. 24 Hours notice for site inspection).
- Ensure all inspection is performed as per
approved Inspection Test Plan.
- Check ITP, Check List, WIR, and NCR (if any) are signed off and cleared by the Consultant Engineer.
7.0 ATTACHMENTS
7.1 Method Statement
7.2 Inspection and Testing Plan
7.3 Check List for Installations
7.4 Risk Assessment